Construction and installation work

Reconstruction of Heating system network in Olaine.

In 2003, "Poliurs" Ltd. reconstructed the entire heating system network in the city of Olaine.

The Olaine project was especially significant due to the fact that Olaine is the first regional Town government in Latvia that used double-piping manufactured by "Poliurs” in the reconstruction of their heating system network, which are known for a significantly smaller amount of heat loss than the traditional heating pipeline pipes that have no canals.

The reconstruction of district heating system in Volgograd

In 2003, 2004 and 2005 “Poliurs” carried out the reconstruction of district heating system in Russia's Southern city Volgograd. In this case the total cost of the project was 2.5 M USD and the project was financed by World Bank. “Poliurs” delivered more than 13.2 km of pipelines.

Heating system reconstruction project in Russian city Sizran
From the May untill September of year 2003, “Poliurs” carried out a district heating system reconstruction project in Russian city Sizran. “Poliurs” delivered and implemented 11 km of magisterial industrially insulated pipelines. To carry out the project city used World Bank loan and the total costs of this project was 1.5 M USD.